The Bank of England has published a near final rulebook for central counterparties (CCPs), refining its 2025 proposals to replace requirements in the UK European Market Infrastructure Regulation with Bank rules. Most requirements are restated without substantive changes. The revised Second Skin in the Game (SSITG) requirement would place capital equivalent to 10% of a CCP’s risk-weighted capital requirement at risk alongside the mutualised default fund, down from the proposed 25%. Margin simulators would have to indicate potential future initial margin calls under relevant stress scenarios, with client access provided where requested and feasible. Public model disclosures have been narrowed to high level descriptions of components affecting margin responsiveness. The proposed requirement to factor client portability into default fund allocations has been dropped because of concerns about distorted incentives and limited benefits for some clearing services.
Supervisory changes raise the thresholds for material model changes, clarify which routine changes fall outside notification requirements and provide a route for urgent changes in exceptional circumstances. A New Collateral Pathway would let established CCPs test new collateral without a material model change permission within an overall limit of 2% per clearing member, measured by value after haircuts. Up to 1% within that limit could comprise otherwise ineligible collateral, but accepting it would still require a waiver or rule modification. These arrangements complement the separately finalised mobilisation policy for new CCPs, which combines limited live testing under activity limits with temporary rule relief where appropriate.
Finalisation depends on HM Treasury legislation, with the new framework expected to take effect in the first quarter of 2027. CCPs would have to meet the SSITG requirement by 1 April 2028. Margin simulator requirements would apply 24 months after the rulebook takes effect, while certain new margin transparency and procyclicality requirements would have a 12-month implementation period.